toDate
Paulo Peres

Paulo Peres

Worked in Back Bay · Beacon Hill · Brighton · South Boston Waterfront

Compiled from the public record. This work belongs to Paulo Peres — is it yours?

Claim this page
Brighton · the 100 block of Nonantum St

Interior renovation

Filed Apr 2025
Brighton · the 100 block of Nonantum St

Interior renovation

Filed Apr 2025
Brighton · the 0 block of Arlington St

Interior renovation

Filed Sep 2022
Brighton · the 0 block of Arlington St

Interior renovation

Filed Sep 2022
South Boston Waterfront

Garage general

Filed Aug 2016
South Boston Waterfront

Interior renovation

Filed Apr 2016
Back Bay · the 100 block of Marlborough St

Interior renovation

Filed Sep 2015
Beacon Hill · the 0 block of Pinckney St

Interior renovation

Filed Jun 2011
Beacon Hill · the 0 block of W Cedar St

Interior renovation

Filed Mar 2011