toDate
Austin costs

How much does a ev charger cost in Austin (78746)?

Typical ev charger in Austin (78746)
≈ $950
medium confidencefrom 44 filings
≈ $650median ≈ $950≈ $1,500
A reference range from comparable filed projects in public records (City of Austin Open Data) — not a quote.
Filed reference n = 44

Built from 44 comparable filed projects in Austin public records (City of Austin Open Data), compiled 2026-07-27 — a filed reference, not a measured invoice total.

Excluded before the median is computed: placeholder and nominal-value filings, filings whose figure is a fee rather than a cost, commercial work types, non-residential properties, apartment-building and high-rise work, and low-confidence category matches.

Honesty is the point. We show the full range and the sample size — a reference, never a single promised number.
Have a ev charger quote? Check if it's fair →

EV charger projects filed in Austin (78746) typically run about $950, with most between $650 and $1,500, based on 44 filings (Austin public records, City of Austin Open Data).

These are comparable filed projects in Austin (78746) — a typical reference range, not a quote. Your project can land anywhere in the spread depending on scope, materials, and access.

Where the money goes

A typical share of a ev charger budget — an illustrative industry breakdown, not measured for this project.

What moves the price

Materials & finishes
The biggest swing — basic vs premium
Labor & crew
Local rates and how many trades are involved
Scope found on-site
Older homes surface surprises once walls open
Filing & timeline
Reviews and inspections add weeks, not just cost

Common questions

What's the typical range for a ev charger in Austin (78746)?

Most ev charger projects in Austin (78746) run $650 to $1,500, with a median around $950, based on 44 filings of comparable filed work (Austin public records, City of Austin Open Data).

How does Austin (78746) compare to citywide ev charger costs?

the 78746 median ($950) is in line with the Austin citywide median ($950) for ev charger projects.

What is the ev charger figure for Austin (78746) based on?

Built from 44 comparable filed projects in Austin public records (City of Austin Open Data), compiled 2026-07-27 — a filed reference, not a measured invoice total. Excluded before the median is computed: placeholder and nominal-value filings, filings whose figure is a fee rather than a cost, commercial work types, non-residential properties, apartment-building and high-rise work, and low-confidence category matches.

How recent is this data?

These figures reflect comparable ev charger projects filed in Austin public records (City of Austin Open Data), compiled as of 2026-07-27. They refresh as new filings are published.

What affects the cost of a ev charger?

Scope, materials, finishes, the age and condition of the home, and site access. The spread above ($650–$1,500) reflects that range — your project can land anywhere in it.

Keep up with everything happening in Austin

toDate keeps you current on what's changing around you — projects, construction, closures, openings, safety. Join the Austin waitlist and be first when it opens near you.

No spam. One email when we launch near you.

Already want it live? See projects near you in the app →