How much does a ev charger cost in SoMa, South Beach (94103), San Francisco?
That difference is the install, labor, and overhead a filing never shows — the part homeowners only see once the work is real.
Get your exact numberBuilt from 30 real paid invoices in the San Francisco Bay Area — what people actually paid, not what a filing declared.
The reference range above is a separate figure: 128 comparable filed projects in San Francisco public records (DataSF), compiled 2026-07-27.
Excluded before the median is computed: placeholder and nominal-value filings, filings whose figure is a fee rather than a cost, commercial work types, non-residential properties, apartment-building and high-rise work, and low-confidence category matches.
EV charger projects filed in SoMa, South Beach (94103), San Francisco typically run about $2,500, with most between $1,400 and $2,500, based on 128 filings (San Francisco public records, DataSF).
These are comparable filed projects in SoMa, South Beach (94103), San Francisco — a typical reference range, not a quote. Your project can land anywhere in the spread depending on scope, materials, and access.
Where the money goes
What moves the price
Common questions
What's the typical range for a ev charger in SoMa, South Beach (94103), San Francisco?
Most ev charger projects in SoMa, South Beach (94103), San Francisco run $1,400 to $2,500, with a median around $2,500, based on 128 filings of comparable filed work (San Francisco public records, DataSF).
How does SoMa, South Beach (94103), San Francisco compare to citywide ev charger costs?
the 94103 median ($2,500) runs about 79% above the San Francisco citywide median ($1,400) for ev charger projects.
What is the ev charger figure for SoMa, South Beach (94103), San Francisco based on?
Built from 30 real paid invoices in the San Francisco Bay Area — what people actually paid, not what a filing declared. The reference range above is a separate figure: 128 comparable filed projects in San Francisco public records (DataSF), compiled 2026-07-27. Excluded before the median is computed: placeholder and nominal-value filings, filings whose figure is a fee rather than a cost, commercial work types, non-residential properties, apartment-building and high-rise work, and low-confidence category matches.
How recent is this data?
These figures reflect comparable ev charger projects filed in San Francisco public records (DataSF), compiled as of 2026-07-27. They refresh as new filings are published.
What affects the cost of a ev charger?
Scope, materials, finishes, the age and condition of the home, and site access. The spread above ($1,400–$2,500) reflects that range — your project can land anywhere in it.
Keep up with everything happening in SoMa, South Beach
toDate keeps you current on what's changing around you — projects, construction, closures, openings, safety. Join the San Francisco waitlist and be first when it opens near you.
No spam. One email when we launch near you.
Already want it live? See projects near you in the app →